Battery Distribution Cluster for Twin Engine with Two Battery Banks715-S
The 715-S allows you to switch the house loads between port and starboard batteries. You can also use the selector switch to parallel the batteries .
QAR 0.00
Battery Distribution Cluster for Twin Engine with Two Battery Banks715-S
The 715-S allows you to switch the house loads between port and starboard batteries. You can also use the selector switch to parallel the batteries .
| Physical Specs | |
|---|---|
| Each in Package Height (in) * | 3.000 |
| Each in Package Width (in) * | 4.000 |
| Each in Package Length/Depth (in) * | 11.500 |
| Each in Package Weight (oz) * | 10.560 |
| Tech Data | |
| RoHS Compliant (Restriction of Hazardous Substances Directive) ° | Contact Compliance |
| Number of Battery Banks | Two |
Only logged in customers who have purchased this product may leave a review.













There are no reviews yet.